Long Slow Remodel: Progress Today
It doesn’t look like we did much when you compare to the before picture, but it was a significant amount of drywall to tear out and the pantry ceiling was a sandwich of drywall and plywood.
So now we have a new pile of drywall to fit into our garbage can over the next week or two. Next stage is pulling down some of those 2x4s. I need to use some of them for the grape arbor I need to construct before the vines leaf out, so I have a deadline there. I’m increasingly of the opinion that we need to move the door into the garage. Which means learning how to cut a door hole, install a door, and move a set of concrete steps. Gonna be a lot of work, but I think if I don’t do it, I’ll be annoyed by it for a long time. And since the door is currently where I want the fridge. I think I have to figure out moving a door before I hire an electrician. Unless I hire a handyman to do all of it, which has some appeal. I’ll have to see what the tax return looks like so I know what budget I have available. I’ll also have to see if my go to renovation guy has any space in his schedule. I suspect he’s booked solid for months. We’ll probably end up doing it ourselves and just hiring out the electrical work.
But for today, we’re at a stopping place.